Ratio And Proportion
Worked Exercise
- Muraya and Dan each made 126kg of a mixture of maize and beans. Muraya mixed maize and beans in the ratio 4:3 while Dan mixed maize and beans in the ratio 4:3 while Dan mixed maize and beans in the ratio of 5:4. How many more kilograms?
- 2
- 3
- 4
- 6
Working
In Muraya’s mixture, maize: beans = 4:3
maize = Ratio of maize/Total ratio x No of kg
=4/7 x 126
72kg
In Dan’s mixture, maize: beans = 5: 4
Maize = Ratio of maize/Total ratio x No of kg
=5/7 x 126
= 70kg
Difference = ( 72 - 70 )kg
= 2kg
The correct answer is A (2kg)
- A rectangular plot measures 12m by 10m.The length of the plot is increased in the ratio 3:2 , while the width is decreased in the ratio 4;5.By what ratio is the area of the plot decreased?
- 4:3
- 5:4
- 6:5
- 3:2
Working
New length after increase
3/2 x 12 = 18m
New width after decrease
4/5 x 10 = 8m
Original area before the increase/decrease
= (12 x 10) m2
= 120m2
New area = (18 x 8) m2
= 144 m2
New ratio = 144: 120
= 6 : 5
The correct answer is C (6: 5).
- Gladys keeps hens, ducks, and turkeys. The ratio of hens to ducks is 5:2. The number of turkeys is 35 less than the number of hens. How many turkeys are there if there are 30 ducks?
- 105
- 40
- 75
- 65
Working
Hens : ducks = 5 : 2
Total ratio = 7
Ducks = 2/5
Hens = 5/7 of x
Therefore 2/7 of x = 30
x = 30 x 7/2
x = 105 (Total hens and ducks)
Hens =5/7 x 105
= 75
Turkeys = (75 – 35)
The correct answer is B (40)
- Elijah and Paul shared some money in the ratio 5:8.Elijah got sh120 less than Paul. How much money did Paul get?
- Sh520
- Sh320
- Sh200
- Sh192
Working
Let the amount Paul got be t
Therefore Elijah got (t-120)
Therefore t -120 : t = 5 : 8
t – 120/t = 5/8
8t – 960 = 5t
8t – 5t = 960
3t = 960
t = sh320
Therefore Paul got = sh 320
The correct answer is B (sh320)
- A contractor employed 60 men to complete a piece of work in 150 days. How many more days would 50 men take to complete the same work?
- 180
- 30
- 40
- 50
Working
60 men take 150 days
1 man take (150x60) days
Therefore 50 men will take 150 x 60/50 days
= 180 days
How many more? (180 – 150) days
= 30 days
The correct answer is B (30 days)
- Eighteen men can finish to dig a piece of land in 45 days. How many days would 15 men take to finish the same piece of land?
- 54
- 2
- 7½
- 9
Working
18 men take 45 days
1 man takes (45 x 18) days
Therefore 15 men will take 45 x 18/15
= 54 days
The correct answer is A (54 days)
Join our whatsapp group for latest updates
Tap Here to Download for 30/-
Get on WhatsApp for 30/-
Download Ratio And Proportion - Class 8 Mathematics Revision Notes.
Tap Here to Download for 30/-
Get on WhatsApp for 30/-
Why download?
- ✔ To read offline at any time.
- ✔ To Print at your convenience
- ✔ Share Easily with Friends / Students