KCSE 2014 Building Construction Paper 1 Questions with Marking Scheme

Share via Whatsapp

QUESTIONS

SECTION A (40 marks)
Answer all the questions in this section in the spaces provided.

  1. Name two tools and two equipment used for setting out a right angle of a building.(2 marks)
  2. Describe the following types of foundations and give two examples in each case:
    1. shallow foundations;
    2. deep foundations.(5 marks)
  3. State four reasons why clay tiles are not commonly used for roofing.(4 marks)
  4. List four undesirable effects of dampness in buildings.(2 marks)
  5.                                
    1. Give four requirements of a drainage system.(4 marks)
    2. State the function of a goose neck bend in a cold water service layout.(1 mark)
  6.                                
    1. State four limitations in starting a small business related to building construction.(2 marks)
    2. Describe the following members of a scaffold:
      1. standard;
      2. guard rail(2 marks)
  7.                          
    1. List two requirements for a safety helmet to be worn on a construction site.(2 marks)
    2. Describe two ways through which moisture can penetrate a building.(4 marks)
  8. Use labelled sketches to show the following features on a wall:
    1. raking back;
    2. toothing.(4 marks)
  9.                            
    1. Outline the procedure of reconditioning the mushroomed head of the cold chisel shown in figure 1.(2 marks)
      q9 auygduyagd
    2. Figure 2 shows masonry wall joints. Name the type of joints labelled (a) and (b) stating the advantage of each.
      q9 2 agdgayud
      1. Name:...........................................................
        Advantage:.....................................................
      2. Name: ..........................................................
        Advantage:.....................................................(2 marks)
      3. Figure 3 shows single line pictorial view of a dwelling house.
        q10 aujgduaygd
        Sketch in Ist angle projection the three orthographic views of the house.(4 marks)

SECTION B (60 marks)
Answer question 11 on the A3 paper provided and any other three questions from this section in the space provided.
Candidates are advised to spend not more than 25 minutes on question 11.

  1. Figure 4 shows a pictorial drawing of a shaped block.(15 marks)
    q14 ahgfdga
    To a scale of 1:1, draw three orthographic views of the block in 3rd angle projection. Insert six dimensions.(15 marks)
  2.                            
    1. State five functional requirements of masonry walls in a building.(5 marks)
    2. Figure 5 shows a floor plan of a house.
      q12 nahdgad
      Sketch and label a vertical section through A - A to show details from the foundation to the roof.(10 marks)
  3.                        
    1.                            
      1. Give one advantage of twisted reinforcement bars over the round reinforcement bars when used in concrete.
      2. State the meaning of each of the items labelled A - F in the reinforcement code given:
        q13 ajgduygad
        (7 marks)
    2. Explain the function of each of the following in relation to plumbing works:
      1. cold water cistern;
      2. water cylinder;
      3. boiler;
      4. rising main.(8 marks)
  4.                          
    1. Use labelled sketches to show the difference between a couple roof and a collar roof.(8 marks)
    2. Figure 6 shows the plan of a block wall with a pier.
      q14 true ahgudyga
      Sketch and label a pictorial strip foundation that will carry the wall and show the projection as per the building regulations.(7 marks)
  5.                  
    1. State two functions of each of the following:
      1. blinding layer;
      2. hardcore.(4 marks)
    2. Sketch and label a cross-section of a trench not more than 1,000 metre deep to show timber supports in hard soils.(5 marks)
    3. Figure 7 shows a timber stud wall with a door opening,
      q15 jygutdgauytd
      Sketch the details at 'A' to show all the members at the opening.(6 marks)

MARKING SCHEME

  1. TOOLS
    • Builders' square
    • Mason's square.
      2 x 21 = 1 mark
      EQUIPMENT
    • Sight square.
    • Dumpy level.
    • Surveyor's square.
      Any 2 x 21 = 1 mark
  2. Types of foundation:
    • Shallow foundation.
      Are those foundation which transfer 1/2 the loads to a subsoil 1/2 at a point near the ground floor of a building. 1/2 (11/2 marks)
      Examples: - Strip foundation. - Raft foundation.
      - Natural foundation. - Poled foundation.
      Accept any other correct example. Any 2 x 1/2 = 1 mark
    • Deep foundation
      These are foundations that transfer 1/2 loads to a subsoil some 1/2 distance below 1/2 the ground floor of the building. Any 2 x 1/2 = 1 mark
      Examples: - Deep strip foundation. - Pile foundation.
      - Pad foundation.
      Accept any other correct example. Any 2 x 1/2 = 1 mark
  3. Reasons why clay tiles are not commonly used as roof coverings.
    • Expensive in terms of maintenance.
    • Expensive to purchase.
    • Not easily available.
    • Needs an expert to lay.
    • Needs keenness to transport since they are brittle.
    • Shape and colour of tiles can be obtained in iron sheets.
      Any 4 x 1 = 4 marks
  4. Four undesirable effects of dampness in buildings.
    • Paint peeling off.
    • Humid atmosphere in rooms.
    • Efflorescence effect.
    • Effect on timber skirtings.
    • Effect of carpets.
    • Encourages wet rot.
    • Encourages fungal growth on structure.
      Any 4 x 21 = 2 marks
  5.                    
    1. Four requirements of a drainage system.
      • Should be self cleansing.
      • Should be straight as possible between two points.
      • Pipes used should be strong enough to resist the pressures placed on them.
      • The bore should be laid true and smooth to ensure that water flows freely.
      • Gradient should be correctly set such that water velocity is maintained which ensures solid matter will be floated along the pipe.
      • Should operate without maintenance.Any 4 x 1 = 4 marks
    2. Use of a goose neck bend.
      It is used to relieve pressure likely to be exerted on the mains connection. 1 mark
  6.              
    1. Limitations in starting a small business in building construction are:
      • Taxes.
      • Acquisition of equipment and machines.
      • Local authority by-laws.
      • Licences (registration)
      • Starting up capital.
      • Location of business.Any 4 x 21 = 2 marks
    2. - Standard: The upright member of a scaffold on to which ledgers, transforms and braces are fixed.
      - Guard rail: A horizontal member above the platform which is fixed on the standards to prevent workers from falling off the scaffold.2 x 1 = 2 marks
  7.                            
    1. Two requirements for an appropriate safety helmet to be worm in a construction site are:
      1. should be hard, not to break easily.
      2. should have soft inner padding.
      3. should have strapping.Any 2 x 1 = 2 marks
    2. Ways through which moisture can enter a building:
      1. By rain penetrating the head of the wall and soaking down into the building below the roof level.
      2. By rain hitting against the external wall and soaking through the fabric into the building.
      3. By the ground moisture entering the building at or near the base and creeping up the wall by capillarity action and entering the building above the ground.Any 2 x 2 = 4 marks
  8. 8 AJHGDTYGATY
    Sketch 2x 1 = 2 marks
    Labels 2 x 1 = 2 mark
    4 marks
  9.                            
    1. Reconditioning of a cold chisel.
      Grind the mushroomed head on the sides until flat with the stem of the chisel. Then grind the end a little to reveal a flat surface on which to hammer.2 marks
    2.  Joint A: Weather struck pointing. It drains off rain water easily.
      Joint B: Concave pointing. It gives a decorative beautiful finish. 2 x 1 = 2 marks
  10.                                     
    10 AYGTYFGAYGFERA
  11.                                                
    11 JAGGFVAGD
    3rd angle projection = 1 mark
    12 faces @ 21 = 6 marks
    6 dimensions @ 21 = 3 marks
    Naming the views = 1 mark
    Curve correctly drawn = 1 mark
    Lines drawn correctly = 2 marks
    Equal spacing of views = 1 mark
    TOTAL = 15 marks
  12.                            
    1. Functional requirements of walls are;
      • Safely transfer imposed loads to the foundation.
      • Prevent penetration of moisture from outside.
      • Retain heat within.
      • Insulate against heat from outside.
      • Fire resistance.
      • Resistant to weather elements like wind.
        Any 5 x 1 = 5 marks
    2.                                            
      12 JGAVDTAD
      Sketch = 5 marks
      Labels (any 10 x 1/2 ) = 5 marks
      (Accept other eaves detail)
      TOTAL = 10 marks
  13.                    
    1.                        
      1. Advantages of twisted bars over round bars.
        • Twisted bars provides better grip due to increased surface area and also increases friction.
        • Higher strength.
          Any 1 x 1 = 1 mark
      2.                                          
        13 HAGFTRDFA
        A - Number of bars.
        B - Type of bar/shape of bar.
        C - Bar diameter.
        D - Bar mark diameter.
        E - Pitch of bars (centre to centre spacing).
        F - Position of bars (bottom)
        6 x 1 = 6 marks
    2. Functions of the following:
      1. Cold water cistern
        • Receives water from the water supply/rising main.
        • Stores water for use in other water cistern.
        • Supplies the water heater.
      2. Water cylinder
        • Stores hot water for use in the house.
      3. Boiler
        • Can either be manual or electrical and is used for heating water.
      4. Rising mains
        • Connects the meter to the overhead storage tank and the kitchen valve.
          4 x 2 = 8 marks
  14.                                            
    1.                                                                  
      14A GAVFAD
    2.                                              
      14B UJYGAYGDYA
  15.                          
    1. Functions of
      1. Blinding:
        • provide a firm surface.
        • prevent loss of cement grout
        • provide a firm surface for laying reinforcement and dpm.
          Any 2 x 1 = 2 marks
      2. Hard core:
        • act as backfill.
        • reduces rising dampness by capillarity.
        • raises the ground floor level.
          Any 2 x 1 = 2 marks
    2.                                    
      15B JSGYFGS
    3.                                   
      15C JAVUHTDA
Join our whatsapp group for latest updates

Download KCSE 2014 Building Construction Paper 1 Questions with Marking Scheme.


Tap Here to Download for 50/-




Why download?

  • ✔ To read offline at any time.
  • ✔ To Print at your convenience
  • ✔ Share Easily with Friends / Students


Get on WhatsApp Download as PDF
.
Subscribe now

access all the content at an affordable rate
or
Buy any individual paper or notes as a pdf via MPESA
and get it sent to you via WhatsApp

 

What does our community say about us?

Join our community on:

  • easyelimu app
  • Telegram
  • facebook page
  • twitter page
  • Pinterest